Expertech Electrical Contractors Ltd successfully executed a 4-pole low voltage line extension, grid metering, and KPLC system digitization project for Gordon Obado Dolla along the Kalandini-Wangarot Route in East Asembo. The project was fully completed on January 15, 2023, expanding local electrical distribution lines and integrating the site into the official utility framework.
Line Extension Infrastructure: Erection of 4 units of 8M concrete poles.
Conductors & Stringing: Installation of 700 units of 0.5m aluminium conductors and 70 units of stay wire.
Hardware & Line Fittings: Complete deployment of support hardware, including brackets, D-irons, shackles, 4.5-inch bolts, 9-inch bolts, and stay rods (16 sets of primary hardware and 3 heavy-duty 9-inch bolts).
System Digitization & Regulatory Approvals: Execution of KPLC system design and acquisition of official KPLC approvals across 4 operational units/stages.
Metering & Connection: Procurement and integration of a KPLC prepaid energy meter and connection.
Logistics & Labor: Comprehensive management covering site logistics, pole erection, transport, and overall technical installation labor.
Subtotal: KSH 239,780.00
Tax: KSH 25,564.80
Grand Total: KSH 265,344.80